In Progress

2026-07-10

Ouroboros Peras

Part of the team was on holidays this week. The rest of us focused on improving our large integration branch by:

  • Rebasing our work on the latest version of the f-f/prepare-11.1 integration branch.

  • Restoring the balance in the test suite --- we fixed several bugs and inconsistencies leading to CI failures. The remaining issues stem from the test suite not being prepared to generate values satisfying assumptions needed by Peras, e.g., that two consecutive blocks should not be separated by more than one epoch.

  • Improving the code tightness and documentation around the Peras-dependent history queries.

  • Opening a separate PR to fix a bunch of issues in the Genesis tests, that were unearthed during Peras development.

  • Continuing the work needed to deploy the integration branch to the Peras testnet.