Weekly Report: 2025-09-15
- Continued technical investigation of n2n-pg and the draft header/block download tool.
- Identified potential integration points with Hoarding Node architecture.
- Documented challenges and limitations observed in the current draft tool implementation.
- Started outlining steps required to convert the draft into an MVP for internal testing.